{"id":22342,"date":"2021-03-17T11:23:51","date_gmt":"2021-03-17T00:53:51","guid":{"rendered":"https:\/\/www.tennis.com.au\/sa\/?p=22342"},"modified":"2021-03-17T11:27:37","modified_gmt":"2021-03-17T00:57:37","slug":"north-stand-demolition-underway-at-memorial-drive","status":"publish","type":"post","link":"https:\/\/www.tennis.com.au\/sa\/news\/2021\/03\/17\/north-stand-demolition-underway-at-memorial-drive","title":{"rendered":"North Stand demolition underway at Memorial Drive"},"content":{"rendered":"\n<p>The Memorial Drive Centre Court redevelopment stage two project reached a major milestone today, with demolition of the North Stand commencing. <\/p>\n\n\n\n<p>Kennett Builders and McMahon Services Australia, two South\nAustralian-based companies, joined forces to begin the demolition process with\nthe building expected to be down within the week. <\/p>\n\n\n\n<p>The $44 million\nstage two project includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>The demolition\nof the&nbsp;<strong>North Stand<\/strong><\/li><li>Construction of\nnew&nbsp;<strong>Northern&nbsp;<\/strong>and<strong>&nbsp;Eastern Facilities&nbsp;<\/strong>linked\nby a concourse level, with enhanced patron amenities, food and beverage\nfacilities<\/li><li><strong>Northern\nFacility<\/strong>&nbsp;to\ninclude a&nbsp;<strong>Media and Sports Technology Centre<\/strong>,\nwith broadcast facilities, media lounge and space for&nbsp;<strong>high performance sports research&nbsp;<\/strong>and&nbsp;<strong>development<\/strong><\/li><li><strong>Eastern\nFacility<\/strong>&nbsp;to be\nintegrated with the Adelaide Oval Southern Plaza, incorporating&nbsp;<strong>high performance training<\/strong>&nbsp;facilities,&nbsp;<strong>premium multipurpose event&nbsp;<\/strong>and<strong>&nbsp;function<\/strong>&nbsp;spaces&nbsp;<\/li><li><strong>Northern<\/strong>&nbsp;and<strong>&nbsp;Eastern Facilities&nbsp;<\/strong>fully\naccessible to all levels<\/li><li>Addition of\nrigging points on the roof and<strong>&nbsp;feature lighting<\/strong>.<\/li><\/ul>\n\n\n\n<p>For more\ninformation on the Memorial Drive Centre Court redevelopment, visit: <a href=\"http:\/\/bit.ly\/2LO0AxS\">http:\/\/bit.ly\/2LO0AxS<\/a> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Memorial Drive Centre Court redevelopment stage two project reached a major milestone today, with demolition of the North Stand commencing. <\/p>\n","protected":false},"author":5736,"featured_media":22349,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-22342","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/posts\/22342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/users\/5736"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/comments?post=22342"}],"version-history":[{"count":0,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/posts\/22342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/media\/22349"}],"wp:attachment":[{"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/media?parent=22342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/categories?post=22342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tennis.com.au\/sa\/wp-json\/wp\/v2\/tags?post=22342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}